Your electrical installation no longer meets standards? EAD, RGE certified electrician, performs complete NF C 15-100 compliance: audit, quote, work, and certificate. Free quote throughout the Var and PACA.
NF C 15-100
standard applied
100%
compliance guaranteed
+20 years
experience
RGE
certified
Risks of a non-compliant installation
Sockets without ground, panel without 30mA residual-current device, or degraded insulation. A deadly danger for the whole family, especially children.
Undersized cables that overheat, loose terminals, outdated panel. Leading cause of domestic fires in France.
In case of a claim, your insurer may refuse compensation if the inspection reveals a non-compliant installation under NF C 15-100.
Since 2009, a Promotelec electrical diagnostic is mandatory for selling a dwelling over 15 years old. A negative diagnostic hinders the sale.
Our compliance process
On-site visit by an RGE electrician. Visual inspection of the panel, differential testing, ground verification, insulation resistance measurement. Detailed report with photos.
Complete line-by-line quote: panel replacement, new wiring, sockets and switches, grounding, surge protector. No surprises. Multiple options according to your budget.
NF C 15-100 compliant installation by certified technicians. Legrand, Schneider, or Hager equipment. Recessed or surface wiring according to building constraints.
Final acceptance with signed and registered NF C 15-100 compliance certificate. Complete file for your notary, insurer, or tenant.
What compliance includes
Complete replacement with a modular panel with circuit breakers and type A or AC residual-current devices according to circuits.
Installation or restoration of the ground connection with copper rod and resistance control (< 100 ohms).
Replacement of obsolete cables with copper sized to standard: 1.5 mm² lighting, 2.5 mm² sockets, 6 mm² cooktops.
Installation of grounded sockets in all rooms, compliant two-way and crossover switches.
Type 2 surge protector installed at the head of the panel to protect against surges from frequent Mediterranean storms.
Replacement of old fixtures with economical and durable LED solutions with compliant recessed spotlights.
Compliance budget
The cost of NF C 15-100 compliance depends on the area, current installation condition, and type of dwelling. Here are our indicative ranges for the Var and PACA:
Studio / T1 (20–35 m²)
€1,500 – €3,000 incl. VAT
1-row panel, 4–6 circuits, partial wiring
Apartment T2–T3 (40–70 m²)
€3,000 – €6,000 incl. VAT
2-row panel, 8–12 circuits, complete wiring
House 100–150 m²
€6,000 – €12,000 incl. VAT
3-row panel, 15–20 circuits, wiring + ground
Villa / Commercial > 200 m²
Custom quote
Free personalized technical study
We perform electrical compliance upgrades throughout the Var: Toulon, Hyères, Fréjus, Saint-Raphaël, Draguignan, Brignoles, La Seyne-sur-Mer, La Garde, Six-Fours-les-Plages, Ollioules, Sanary-sur-Mer, Bandol, as well as Marseille, Nice, Aix-en-Provence, and Cannes.
Mise en conformité électrique
EAD réalise la mise en conformité NF C 15-100 dans toutes les communes du Var. Sélectionnez votre ville pour découvrir nos services dédiés.
Saint-Zacharie
83640
Toulon
83000
Hyères
83400
La Seyne-sur-Mer
83500
Six-Fours-les-Plages
83140
Ollioules
83190
Sanary-sur-Mer
83110
Bandol
83150
Saint-Tropez
83990
Fréjus
83600
Saint-Raphaël
83700
Draguignan
83300
Brignoles
83170
Sainte-Maxime
83120
Cogolin
83310
Grimaud
83310
Le Lavandou
83980
Bormes-les-Mimosas
83230
Rocbaron
83136
Cuers
83390
La Crau
83260
Pierrefeu-du-Var
83390
Puget-Ville
83390
Garéoult
83136
Méounes-lès-Montrieux
83136
Solliès-Pont
83210
Solliès-Toucas
83210
Solliès-Ville
83210
La Farlède
83210
La Valette-du-Var
83160
La Garde
83130
Collobrières
83610
Gonfaron
83590
Le Cannet-des-Maures
83340
Vidauban
83550
Les Arcs-sur-Argens
83460
Lorgues
83510
Flassans-sur-Issole
83340
Cabasse
83340
Le Thoronet
83340
Carcès
83570
Cotignac
83570
Barjols
83670
Saint-Maximin-la-Sainte-Baume
83470
Nans-les-Pins
83860
Besse-sur-Issole
83890
Pignans
83790
Carnoules
83660
Puget-sur-Argens
83480
Roquebrune-sur-Argens
83520
Trans-en-Provence
83720
Le Muy
83490
La Motte
83920
Fayence
83440
Seillans
83440
Montauroux
83440
Callian
83440
Tourrettes
83440
Saint-Paul-en-Forêt
83440
Bagnols-en-Forêt
83600
Saint-Aygulf
83370
Les Issambres
83380
La Croix-Valmer
83420
Ramatuelle
83350
Gassin
83580
Cavalaire-sur-Mer
83240
La Londe-les-Maures
83250
Carqueiranne
83320
Le Pradet
83220
La Garde-Freinet
83680
Plan-de-la-Tour
83120
Sainte-Anastasie-sur-Issole
83136
Montfort-sur-Argens
83570
Entrecasteaux
83570
Salernes
83690
Aups
83630
Tourtour
83690
Villecroze
83690
Ampus
83111
Châteaudouble
83300
Figanières
83830
Taradeau
83460
Saint-Antonin-du-Var
83510
Callas
83830
Bargemon
83830
Mons
83440
Saint-Cyr-sur-Mer
83270
Évenos
83330
Le Beausset
83330
La Cadière-d'Azur
83740
Signes
83870
Mazaugues
83136
La Roquebrussanne
83136
Tourves
83170
Riboux
83136
La Môle
83310
Free audit
Receive a visit from an RGE electrician for a complete diagnostic of your installation. Detailed quote within 48h with no commitment.
FAQ
Everything you need to know about compliance upgrades in the Var and PACA
NF C 15-100 compliance is mandatory for any new electrical installation and strongly recommended, even necessary, when selling a property. Since January 1, 2009, a Promotelec electrical diagnostic is mandatory for selling a dwelling over 15 years old. If the diagnostic reveals anomalies that could compromise personal safety (category 3), the seller must repair them before the sale or inform the buyer. Outside of a sale, a non-compliant installation may invalidate your home insurance in case of fire or electrocution. EAD performs complete compliance upgrades with certificate throughout the Var and PACA.
Rewiring an old house in the Var costs on average between €60 and €120 incl. VAT per square meter, depending on the condition of the building and the complexity of the project. For a 100 m² house, the overall budget is €6,000 to €12,000 incl. VAT. This price includes complete replacement of the electrical panel with modular breakers from Legrand, Schneider, or Hager, new NF C 15-100 compliant copper wiring (1.5 mm² lighting, 2.5 mm² sockets, 6 mm² cooktop), grounding with copper rod and resistance control, installation of grounded sockets in all rooms, replacement of switches, and the compliance certificate. Additional costs may come from renovating moldings, chasing into stone walls typical of Provençal farmhouses, or installing a three-phase connection breaker.
Several signs indicate a non-compliant electrical installation: your panel still uses porcelain fuses instead of modular breakers, your sockets have no ground (two holes instead of three), you have no 30mA residual-current device at the head of the panel, visible cables are sheathed in fabric or black rubber, you smell burning near the panel, or your breakers trip regularly. Age is also an indicator: installations dating from before 1990 are very often obsolete. EAD offers a free 30-minute visual audit. Our RGE electrician examines the panel, tests the differentials, checks for ground presence, and evaluates the general condition of the wiring. You receive a report with photos and a detailed quote.
Yes, several financial aids exist for electrical compliance work, provided you use an RGE electrician like EAD. MaPrimeRénov' (formerly CITE) may cover part of the energy improvement work including electrical if linked to a comprehensive renovation. The interest-free eco-loan (éco-PTZ) can finance the work with no down payment. Some Var and Alpes-Maritimes local authorities offer local subsidies for energy renovation of old housing. For owners of second homes, specific aids exist in certain municipalities. EAD assists you with your subsidy application and provides all necessary documentation (RGE invoices, certificates, before/after photos). Ask us for a personalized assessment during the audit.
The duration of electrical compliance work depends on the dwelling area, the condition of the existing installation, and the complexity of the building. For a 50 m² apartment with partial renovation: 3 to 5 days. For a 100 m² house with complete wiring: 1 to 2 weeks. For a 200 m² villa or commercial premises: 2 to 4 weeks. At EAD, we schedule the work to minimize power cuts: generally, only one night without electricity when replacing the main breaker. For total renovations, we install a temporary panel so you can live normally during the works. All our sites in the Var and PACA are planned with a detailed schedule communicated in advance.
A partial renovation consists of replacing only the defective or dangerous elements: the outdated electrical panel, a few obsolete circuits, or the absence of ground in certain rooms. This is an economical solution for tight budgets, but it does not guarantee total installation compliance. Full compliance replaces the entire electrical installation: new wiring in all rooms, complete modular panel with all breakers and residual-current devices, general grounding, grounded sockets everywhere, LED lighting, surge protector, and NF C 15-100 compliance certificate. EAD recommends full compliance for homes built before 1990 and partial renovation for installations from 1990 to 2010 that only need an upgrade. We advise you during the free audit.